Here's a camera phone shot of the kitchen as of a couple three weeks ago. It's very natural woody feeling.
We still have to...
1) buy and install the track lighting and rewire, buy, and install the overhead light (a hanging pendant)
2) finish patching/leveling the walls and paint
3) install the range hood and vent outside
4) pick the color and then install custom concrete counters
5) build custom shelves and four space frames before the counters go in
6) pick out a sink
7) buy the faucet we like (this one)
Friday, April 14, 2006
Temporary Counters
Sink Cabinet level.jpg
I spent a day installing three cabinets, an end cap, the dishwasher, and running new supply lines for the sink.
The floor slopes away rather dramatically, so there was lots of shimming to get it all lined up.
I crafted a counter out of two sheets of 3/4" birch plywood, sealed with Velvit Oil. I joined the pieces, both a full 8' long, with pocket screws. I used the Pocket Rocket. I like that tool a ton. No need for a million clamps, glue or biscuits.
Once the concrete goes in, the counters will move to the basement workshop. I'll just remove the screws and then I'll reassemble once they're in position downstairs. I'll have a very nice shop and plenty of workspace as well!
Subscribe to:
Posts (Atom)